Solar for Steel Industry
Steel production is a high power, high load and continuous process. Electricity costs are a huge cost in your operation within induction furnace units, EAF Mills and Rolling Mills. Installing solar either on a rooftop or ground mount will reduce your electricity costs, lower your carbon footprint and create a better story for you when customers ask about green steel.
At a glance
- Reduced electricity costs: Solar for Steel tends to be much cheaper than standard industrial tariffs. Often the savings are seen during the daytime when most plants are using the highest amounts of electricity.
- Reduced emissions: Every unit of solar you have means less grid electricity being used. This will reduce scope 2 emissions.
- Flexible: You can utilize large areas of unused roof space within your sheds and stock yards. Or you can install additional capacity on spare land or off site with captive or PPA.
Why Should You Consider Solar for Steel Industry?
Steel production is responsible for around 7%-9% of global co2 emissions. This puts steel at the top of every decarbonisation list. However the majority of emissions come from process emissions within the coke, coal and blast furnace process. These cannot be solved with solar for steel. However the electricity component can be reduced which has become more prominent in recent times.
- Customers are demanding: Auto makers, construction majors and exporters are demanding product carbon footprints and clean energy data from suppliers.
- Carbon border policies are becoming more strict: The EU Carbon Border Adjustment Mechanism (CBAM) went into its final stage on 1 January 2026. This means Iron and Steel importers will have real financial implications based on embedded emissions. At present for Iron and Steel the main focus is on direct emissions, meaning solar for steel will not help you escape CBAM costs. However it will bring your overall carbon intensity down and allow you to have more data to show.
- Electricity is a major cost: Any reliable way to reduce reliance on grid electricity will help your margin if you are electricity intensive. Solar for steel will not make your Blast Furnace go green. However it is one of the quickest, lowest risk and most bankable ways to get green.
Rooftop Solar for Steel Mills/Processing Plants
Steel plants will have plenty of large flat areas facing the sun with no income. This can be utilised with solar panels. This means dead space can be turned into a power station with no land being purchased.
Make sure the roof is capable of holding the additional weight. Solar for steel will typically weigh between 10-15kg/m2 including mounting. Older sheds will need to have a load calculation carried out and some may need strengthening. Steel plants emit fine particulates, high temperatures and sometimes corrosive gases. Make sure you specify modules and mounting solutions which have been tested in harsh environments such as salt mist and ammonia corrosion standards. Structures will also require anti-corrosive coatings.
Roofs over furnaces can be very hot. Ensure you choose modules with a low temperature coefficient and ensure there is enough air gap. Dust can rapidly reduce output. Plan your cleaning schedule, and consider dry or robot cleaning for large roofs. Ensure you comply with fire regulations, ensuring cables are routed correctly with isolation and walkways. Ensure your maintenance teams are safe whilst working at height.
As a ballpark figure you will need around 7-10m2 per kW. This means large sheds can have a significant system installed. Best suited for large roof areas, little land available and wanting to get started quickly and with minimal civils.
Ground Mount Solar for Steel Facilities
If the loads on your plant are much larger than what can be covered on your roof then a ground mounted solution is best. This can be from a few mega-watts up to utility scale. It allows you more flexibility to optimise.
Single axis tracker systems will follow the sun and typically increase generation by around 15%-25% depending on location. Bifacial modules will also generate from the back of the module, increasing generation by a few percent up to 10% depending on the ground surface. Ground mounted solutions are easier to clean than rooftops. This can be connected directly to your substation. Typically you will require 4-5 acres per MW. This can increase if using trackers.
If you don’t have land available you can purchase solar electricity from another project. In India group captive usually requires captive consumers to have at least 26% equity and 51% energy consumption. Check current regulations and charges at state level. Best suited for large loads, available land, or wanting a large portion of renewable energy without using roof space.
Solar for Steel Plant
Steel plants are highly loaded plants. Units such as EAF’s, induction furnaces and rolling mill drives will draw high spikes of electricity. Here is how solar for steel will work:
Solar for Steel will be installed at a plant level and not furnace level. Solar will be fed into the plant bus and the grid will provide a stable source of power. The furnace will never be running on solar. However it will reduce the amount of electricity drawn from the utility.
- Partial generation: Mills often operate 24/7 so solar for steel will typically reduce a percentage of your yearly consumption. Rooftop systems often reduce around 10-30%. Larger ground mount or off site projects will have more of an impact.
- Quality of generation: EAF’s are known for causing flicker and harmonics. A good design will look at these issues. Inverters and filters will be correctly rated.
- Batteries: Not essential. Battery energy storage systems (BESS) can help reduce peak demand, smooth out rapid changes and store solar for later in the evening. However this depends on your tariff and demand charges.
- Hybrid: Using a mix of solar, wind/hybrid renewable energy, storage and grid a full 24/7 solution can be achieved with a lower carbon intensity.
- Lower unit cost: Solar will often be cheaper than industrial tariffs. This is often where you will see the majority of your savings.
- Payback: Well sited industrial projects will often have a payback period of around 3-6 years (capex). This depends on your tariff, system cost, plant load profile and available incentives.
- Opex: If you don’t want to invest in capital then purchasing power via PPA or group captive will allow you to purchase power at an agreed rate with little to no upfront costs.
- Tax and incentives: Depreciation and state policies can improve your returns. However these often change. Check with your tax adviser for your current position.
- Lifespan: Modules will typically have a warranty of 25 years or more. They will degrade slowly, typically 0.4-0.55% per year. You will need to factor in an inverter replacement.
Comparing Industrial Solar for Steel Industry Options
| Parameter | Rooftop solar panels | Ground mount solar | Off-site (group captive / PPA) |
|---|---|---|---|
| Space needed | Existing plant roofs | Dedicated or adjacent land | None at your plant |
| Typical capacity | From about 500 kW to several MW, limited by roof area | Multi-MW to utility scale | Multi-MW to utility scale |
| Upfront prep | Roof strength and condition check | Land, grading and foundations | Contracts and open access approvals |
| Maintenance | Work at height, dust control | Easier ground access, automated cleaning possible | Handled by the project developer |
| Yield | Fixed tilt, roof orientation limits output | Highest with trackers and bifacial modules | Depends on site chosen |
| Main advantage | No land cost, fast to install | Biggest energy yield per kW | Large renewable share with low capex |
| Watch out for | Roof age, shading, heat | Land availability and cost | Transmission and open access charges, policy changes |